Yahoo Search Búsqueda en la Web

Resultado de búsqueda

  1. Hace 18 horas · Signature. Prince Albert of Saxe-Coburg and Gotha (Franz August Karl Albert Emanuel; [1] 26 August 1819 – 14 December 1861) was the husband of Queen Victoria. As such, he was consort of the British monarch from their marriage on 10 February 1840 until his death in 1861. Victoria granted him the title Prince Consort in 1857.

  2. 20 de may. de 2024 · Regency of Wartislaw IV, Duke of Pomerania (1319–1320) Son of Henry I. Died as a minor. After the extinction of the Ascanian dynasty in 1320, Brandenburg came under the control of the Emperor Louis IV of the House of Wittelsbach , who granted Brandenburg to his eldest son, Louis V of Bavaria.

  3. 26 de may. de 2024 · She was born as the only chilld of Duke Adolf Friedrich zu Mecklenburg-Schwerin (1873-1969) and his wife Princess Victoria Feodora Reuß (1889-1918), who died one day after giving birth to her daughter.

  4. 26 de may. de 2024 · As Duke (Hereditary Prince) Georg Alexander Michael zu Mecklenburg (-Strelitz) and Hande Macit are living in Rotterdam, The Netherlands, I had already planned to go to their civil wedding in Rotterdam in June. But for reasons important to them the couple decided last minute to marry on 17 June 2022 at Mirow Castle, Germany, instead.

  5. 28 de may. de 2024 · The duchy originated from the realm of Wartislaw I, a Slavic Pomeranian duke, and was extended by the Lands of Schlawe and Stolp in 1317, the Principality of Rügen in 1325, and the Lauenburg and Bütow Land in 1455.

  6. 23 de may. de 2024 · Dutch transmission system operator (TSO) TenneT Holding BV announced today that it has awarded contracts for the BorWin5 offshore grid connection system to the consortium of Siemens AG (ETR:SIE) and Dragados Offshore SA and Danish industrial group NKT A/S (CPH:NKT).

  7. 28 de may. de 2024 · Transmission system operator (TSO) Amprion GmbH has started building the DolWin4 and BorWin4 offshore links that will connect wind farms in the North Sea to the German onshore transmission grid. The construction of the company's first offshore projects began with the drilling to cross below the island of Norderney, Amprion said on Monday.