Yahoo Search Búsqueda en la Web

Resultado de búsqueda

  1. Hace 4 días · Mumbai-Ahmedabad Bullet Train Project: The NHSRCL has completed excavating a 394-meter-long tunnel in Navi Mumbai for the Mumbai-Ahmedabad bullet train project, a key milestone that will expedite further construction. The project, which includes a 21 km tunnel with a significant underwater section, is funded primarily by a low-interest loan from Japan., Infrastructure News, ET Now

  2. Hace 3 días · The construction work of a 394-meter-long additionally driven intermediate tunnel (ADIT) was completed last week at Ghansoli for the Mumbai-Ahmedabad bullet train project, National High Speed Rail Corporation Limited (NHSRCL) officials said. The ADIT tunnel is meant to provide construction workers ...

  3. Hace 4 días · Bullet train to be operational by 2026. Railways Minister Ashwini Vaishnaw announced in March that the much-anticipated bullet train project is expected to be operational by 2026, with initial ...

  4. Hace 4 días · 0. 210. Metro Rail News (Navi Mumbai): On 22 May, India’s ambitious 508.17km long Mumbai-Ahmedabad Bullet Train project achieved a major breakthrough when Afcons Infrastructure successfully completed the excavation work of a 394-meter-long Additionally Driven Intermediate Tunnel (ADIT) in Navi Mumbai. Image credit: Sajal Bhoyar.

  5. Hace 4 días · MUMBAI: An additional 394-meter intermediate tunnel has been made at Ghansoli in Mumbai to speed up the ongoing Mumbai - Ahmedabad bullet train project. This new intermediate tunnel will help speed up the 21-km-long main tunnelling work between BKC and Shilphata, abutting the Thane creek. Know more about the project.

  6. Hace 4 días · Read more ... The Additionally Driven Intermediate Tunnel (ADIT) of 394 meter at Ghansoli for Mumbai- Ahmedabad Bullet Train Project, has been excavated. This will expedite the construction of 21 km long tunnel between BKC and Shilphata in Maharashtra.

  7. Hace 5 días · Undersea tunnel graphic. In a significant milestone for the Mumbai-Ahmedabad Bullet Train Project, the Additional Driven Intermediate Tunnel (ADIT) at Ghansoli has been successfully excavated. The ...